Walkthrough Before We Start
Before a single carton opens, the lead installer walks every room, bounces on the joists to find soft spots and sketches the plank direction for you.
Before a single carton opens, the lead installer walks every room, bounces on the joists to find soft spots and sketches the plank direction for you.
Brazil Floors installers carry NWFA certification and work on our payroll, never as day hires, with the company holding a Massachusetts license and full insurance.
First thing on install day the tape comes back out. Doorways get rechecked, wood gets counted against the order and thresholds are staged by each room.
Workmanship on every Erving wood floor stays our responsibility for twelve months, plus the mill backs its planks.

Rows running alongside the longest wall keep a busy kitchen calm and the cutoff pile small.

Short oak blocks meet at right angles in herringbone, lively in an entry hall.

Angle cut ends let chevron rows form a straight seam of V shapes down a hallway.

Set at a slant, planks lead the eye corner to corner, so a small den off Route 2 feels wider than it is.

Square parquet tiles flip grain direction each block, a crisp look in a front sitting room near the river.

Little pairs of strips laid crosswise give a basket weave, a crafted texture for a reading room.



Nail down is $2.25/Sq Ft, nail plus glue $2.50/Sq Ft and floating engineered $2.00/Sq Ft. With our wood supplied, unfinished hardwood totals $5.50/Sq Ft installed and prefinished totals $6.00/Sq Ft.
Yes. Solid wood swells and shrinks with humidity, so our driver drops it off early and we meter both planks and plywood before the nailer comes out.
It can be. Removal tends to land around $1.00/Sq Ft, though glued tile or a second layer can change that, and the final figure is written into your estimate.
Yes, and it costs $250 flat. Couches, beds and the china cabinet get carried to another room and come back to their spots once the floor is done.
Our Coventry warehouse loads it the day after you order, which keeps your project from stalling while the planks are in transit.
Labor gets paid the first morning of installation, and wood gets paid once it reaches your driveway. No hefty deposit up front.
For one year we answer for any flaw in our installation work, and the plank manufacturer adds a separate warranty for the wood.
Send us any written hardwood quote for an identical job, and we will beat it. Our contractor pricing on material goes to you too.