Walkthrough Before We Start
Before work in South Salem, walk through the rooms with the plan. Check retained floors, thresholds and access routes, and confirm preparation and responsibilities.
Before work in South Salem, walk through the rooms with the plan. Check retained floors, thresholds and access routes, and confirm preparation and responsibilities.
For Cross River installation, request the required contractor and insurance documents. Confirm your floor system before work.
Remeasure Goldens Bridge spaces before your board order. Include all closets, pattern cuts and an allowance for the planned layout.
Keep the Lewisboro scope and your product directions. Brazil Floors backs workmanship for one year; material warranties have separate terms.

Straight planks in Cross River connect adjoining rooms. Examine the main sightline before setting rows.

A Goldens Bridge herringbone area needs clear setting out, with its border and door connections measured.

For Waccabuc chevron, confirm the specified angles and board sizes before deciding where the pattern begins.

Diagonal boards change the view of a South Salem room. Allow for perimeter cuts while calculating the timber order.

For Vista checkerboard, plan alternating blocks and borders before ordering the material for the pattern.

Lewisboro basket weave needs matched board dimensions. Review the woven pattern, borders and cuts before fitting.



The proposed layout can be assessed across connected rooms. Doorways, the supporting floor and product requirements determine whether a continuous run is appropriate.
Check species, width, thickness and finish on actual samples. Age and previous coatings can prevent an exact visual match even when the new boards fit.
Viewing the sample in the room helps assess its grain and sheen against retained finishes. A showroom or screen image may look different under your lighting.
Request removal and disposal in the written scope. The exposed surface must then be assessed before the required preparation is confirmed.
Identify the clearance before ordering. The floor thickness, supporting layers and door treatment need to be considered together rather than corrected after fitting.
Discuss the intended position, product and adjoining surfaces during measurement. A border changes the layout and material allowance, so it should be part of the approved plan.
No. Follow the exact flooring instructions for the base, environment and attachment method. Construction type alone does not establish whether a product suits your room.
Check the product specification, quantity, storage arrangements and clear delivery route. Resolve access and preparation responsibilities before the start date is set.