Walkthrough Before We Start
River valley air is damp in summer and bone dry once the woodstoves start, so the oak acclimates inside the house until the meter agrees with the subfloor. Nailing begins after that, not before.
River valley air is damp in summer and bone dry once the woodstoves start, so the oak acclimates inside the house until the meter agrees with the subfloor. Nailing begins after that, not before.
The installers in your Kent home are Brazil Floors employees, licensed, insured and NWFA certified. No day labor, no outside crew.
Every room is measured wall to wall and the cartons, moldings and reducers are set out in the order they go in. The crew never stops to hunt for a threshold.
You get twelve months of labor warranty from us plus the manufacturer warranty on the flooring, both running from the day the job wraps.

Planks run with the longest wall, the fastest and least wasteful layout, and they make a long farmhouse parlor read even longer.

Short boards set at right angles in a zigzag, every piece cut by hand. Handsome in the dining room of an 1800s Kent house.

Boards mitered to meet in a crisp V down the middle, a good fit for the big open kitchens in the hill homes above South Kent.

A 45 degree lay draws the eye across and makes a narrow village kitchen on Route 7 feel wider.

Oak squares with alternating grain, true parquet, suited to a library or sunroom in Kent Center.

Short pieces woven inside a dark border, a pattern for the front rooms of the older houses near Kent Falls.



Labor is $2.25/Sq Ft for nail down, $2.50 for nail and glue and $2.00 for floated engineered. With oak from our warehouse, unfinished runs $5.50/Sq Ft installed and prefinished $6.00.
It can if the boards go down too soon. We let the oak sit in the house and nail only when the meter shows it matches the subfloor.
Yes, as engineered oak floated over a pad at $2.00/Sq Ft of labor. Solid oak stays on the upper floors.
We do, at about $1.00/Sq Ft, and the old material leaves in our truck. The subfloor is screwed down and leveled before anything new is laid.
Online bookings take $250 off the installation, and we move your furniture for a flat $250 if you would rather not.
Prefinished oak in a few rooms is usually one or two days. Unfinished oak that gets sanded and finished on site runs about a week.
Brazil Floors employees, licensed, insured and NWFA certified. We never hand a Kent job to a subcontractor.
Twelve months on our labor plus the manufacturer warranty on the boards. Both begin the day we finish.