Walkthrough Before We Start
Our lead installer walks through first, pressing on the subfloor to find any give, writing down every door height and choosing which way the boards should travel.
Our lead installer walks through first, pressing on the subfloor to find any give, writing down every door height and choosing which way the boards should travel.
No one hired by the day works in your home. Every installer is a Brazil Floors employee who is licensed, insured and NWFA certified.
Come install morning, cartons are counted against the plan and reducers are set out by each opening. Fastening begins only after that check.
We guarantee labor for twelve months, and the wood keeps whatever warranty its manufacturer gives.

Boards parallel to the longest wall are the classic layout, and they leave the least waste.

Short planks stepped in a zigzag bring a formal dining room a woven, period feel.

Mitering each end creates sharp arrows that lead the eye through a front hall.

Rows at 45 degrees stretch a narrow bedroom and disguise a wall that is not square.

Parquet squares set grain against grain make a precise grid under a table.

Basket weave flips short strips in each square, a hand-built detail for a library or study.



Labor for nail-down is $2.25/Sq Ft, which already counts nails and underlayment. If we supply the oak, it is $5.50/Sq Ft unfinished or $6.00/Sq Ft prefinished, installed.
Not for us. Crews pull up the old layers, check the plywood and fasten down loose areas before nailing. Tear-out is about $1.00/Sq Ft.
Engineered hardwood floated over underlayment with glued seams. Labor is $2.00/Sq Ft and nothing is nailed into the concrete.
Yes, vinyl plank labor is $2.00/Sq Ft and laminate labor is $1.99/Sq Ft. Both have material packages too.
Next day. Boxes come from the Natick warehouse, and the date the crew begins is set during your estimate.
Each new hardwood tread costs $60 with the riser, nosing and stain folded in. Existing steps in good shape are refinished at $50 each.
Yes, for a flat $250 we move it out and back.
Labor is paid as the crew arrives, material as the boxes are delivered, and sanding in halves, at the start and the final coat.