Walkthrough Before We Start
Salt air makes wood swell in August and shrink in February, so our lead installer meters the subfloor, checks each doorway and chooses a board direction before any wood is ordered.
Salt air makes wood swell in August and shrink in February, so our lead installer meters the subfloor, checks each doorway and chooses a board direction before any wood is ordered.
The people in your house are Brazil Floors employees, never subcontractors, and every one holds a license, insurance coverage and NWFA certification.
The first morning starts with a second round of measuring. Cartons are carried to their rooms and transitions are laid out at each opening before the nailer fires.
A full year of coverage applies to our labor, and the mill's own warranty protects the planks, which means the install and the oak are both covered.

Rows run alongside the longest wall, which trims waste and settles a room with big windows.

Short boards laid in a zigzag give a dining room a woven, period feel.

Ends are cut at 45 degrees so the rows meet in sharp arrows that draw the eye along a hallway.

Planks turned diagonal to the walls stretch a compact room and make a small cottage feel wider.

Oak squares with alternating grain bring a parquet look to a sunporch facing the water.

Pieces woven over and under, usually with a dark border, belong in the grander homes near the Nichols House.



Labor for nail down is $2.25/Sq Ft, with nails and underlayment folded in. Bought through us, unfinished oak installed is $5.50/Sq Ft and prefinished is $6.00/Sq Ft.
It moves wood more than inland air does, so we meter the oak and the subfloor and leave expansion gaps. A sealed finish also helps the boards hold steady.
Yes. Tear-out is about $1.00/Sq Ft and the debris goes with us. Moving furniture out and back is a flat $250.
No, but engineered planks can. We float them over underlayment for $2.00/Sq Ft with glued joints, and nothing penetrates the concrete.
Material leaves our Natick warehouse for next day delivery, and the installers follow close behind.
Yes. We check the subfloor, shim or level the low spots and fasten new plywood where the old base is soft.
Labor is due when the crew arrives and begins, and material is due as the boxes are delivered. A sanding job is half at the start and half at the final coat.
A year on our labor, along with the manufacturer's warranty on the wood. The installers are our own licensed, insured, NWFA certified employees.