Treads, Risers and Nosing
For a Greenville project, record the rise, tread depth and nosing detail where every end of the flight meets the surface. Note which stair trim stays.
For a Greenville project, record the rise, tread depth and nosing detail where every end of the flight meets the surface. Note which stair trim stays.
For a Greenville project, view a finished tread sample beside the rail, riser and retained landing wood. Note which stair trim stays.
For a Greenville project, investigate movement at the existing tread and support before covering or replacing it. Note which stair trim stays.
For a Greenville project, compare the stair workmanship terms and keep the recorded details of the replaced parts. Ask about the written terms.



Record each rise, tread depth and the height of the upper and lower floors. Record the details of the junction of the top step and the hall.
In a hillside house with a stepped entrance, show how the posts attach to the stair. The installation plan needs to account for their location and support.
Take an individual tracing of each angled step and mark which edge meets the wall. Include the lighting in a room set back from Mountain Road.
In a hillside house with a stepped entrance, inspect the stair after lifting enough carpet to identify the base and confirm the dimensions.
Compare a dried tread sample beside the retained landing and rail under the same light. Measure the floor by the floor edge beneath a retained door.
In a hillside house with a stepped entrance, investigate the connection and support before deciding which parts need repair or replacement.
Its finished thickness can move the walking surface relative to the landing. Measure the proposed assembly before ordering. Check the clearance near US 6.
In a hillside house with a stepped entrance, show the entire flight, both floor connections and the ends of the steps where trim or railings meet.