Walkthrough Before We Start
Slush tracked in from the Parkway commute, a kid's cleats on the landing and a pasta night that goes sideways. Oak under a hard finish absorbs the routine.
Slush tracked in from the Parkway commute, a kid's cleats on the landing and a pasta night that goes sideways. Oak under a hard finish absorbs the routine.
Material ships out of our warehouse in Long Branch, NJ, and next-day delivery from Long Branch keeps the crew from standing around waiting on boxes.
Oak, engineered and prefinished samples travel in our van and are held against your actual walls, so the color is judged in the light of your own Woodbridge Township rooms.
Labor is warranted for one year, and the boards carry the manufacturer's coverage. We use our own employees on every install, never subcontractors.

Oak fastened over a solid subfloor cures the hallway creak that shows up in cape homes of that era.

Floated engineered boards cover a basement slab quickly and leave the upstairs undisturbed.

Split level half flights are no problem, because the crew hand carries every box to the room.

Over a plywood addition, nail and glue at $2.50/Sq Ft plus adhesive keeps boards from shifting.

A pale, matte prefinished oak makes a modest Colonia living room feel wider.

A hard satin finish handles winter salt and slush at the front door.



Nail down labor is priced at $2.25/Sq Ft, nail and glue at $2.50 with adhesive on top, and a floated engineered install at $2.00. With boards from us in the mix, unfinished oak lands at $5.50/Sq Ft installed and prefinished at $6.00/Sq Ft.
Normally yes, because the subfloor is screwed down to the joists before the first board. Most creaks come from loose plywood, and that gets solved in prep.
A floated engineered plank is the answer there, at $2.00/Sq Ft of labor. The slab gets a moisture test first.
Yes, for about $1.00/Sq Ft. Staples and tack strips leave with it and the pad goes in our truck.
It is optional and a flat $250. Booking your estimate on the web takes $250 off separately.
A couple of prefinished rooms take about two days. Unfinished oak sanded and coated in place needs closer to a week.
Our warehouse in Long Branch, NJ, with delivery arriving the day after you order.
Our payroll employees do the work, and you get a one year labor warranty plus the maker's warranty on the boards.