Walkthrough Before We Start
Salt tracked in from the Raritan Bay boardwalk, kids racing between a front stoop and the kitchen, a heavy dinner table dragged out for family. Oak carries all of it.
Salt tracked in from the Raritan Bay boardwalk, kids racing between a front stoop and the kitchen, a heavy dinner table dragged out for family. Oak carries all of it.
The wood is stocked at our warehouse in Long Branch, NJ, and next-day delivery from Long Branch puts it in your hallway before the crew arrives.
Because floor joins and doorway heights matter in older city buildings, we lay full samples across your rooms and check how the new height meets each threshold.
We guarantee labor for one year, and the boards have the maker's warranty. Perth Amboy jobs are done by our own payroll crew, never by a hired-in team.

Straight runs of red oak bring a long rowhouse hall back to a single clean line from the door to the kitchen.

A floated plank over an older concrete deck keeps the ceiling height steady in a Raritan Bay apartment.

Steep stoops and narrow stairwells in two family houses are handled by hand, so no box is left on the sidewalk.

A second floor unit over plywood receives nail and glue at $2.50/Sq Ft plus adhesive, which keeps the boards from drumming.

Dark prefinished walnut gives a shop apartment on High Street a polished look from the first day.

Where hardwood meets tile at a doorway, we measure heights first and set a transition that sits flat.



Expect $2.25/Sq Ft for nail down labor, $2.50 plus adhesive for nail and glue work, and $2.00 for floated engineered planks. Buying the wood from us makes it $5.50/Sq Ft unfinished or $6.00/Sq Ft prefinished.
Yes, after we find the cause and level or reinforce the subfloor. Old brick houses settle unevenly, so we measure at the estimate and say what needs fixing.
We check each threshold before ordering. A new floor that sits taller than the old one gets a tapered transition so nobody trips.
We can, at about $1.00/Sq Ft, and we haul away the waste. Soft spots in the subfloor are mended before wood goes on.
Yes, with the landlord's approval. We explain schedules and noise limits so the building stays comfortable.
A pair of prefinished rooms is usually done within two days. Unfinished oak that is sanded and coated on site needs about a week.
Booking online takes $250 off. We also move furniture for a flat $250 if you want the help.
Licensed, insured Brazil Floors employees, never subcontractors. Labor has a one year warranty and the boards have the manufacturer warranty.