Boards Matched to Yours
Standard width red oak strip is on nearly every Ashland floor, so it rides on our truck, and we layer stain until the replacement boards disappear.
Standard width red oak strip is on nearly every Ashland floor, so it rides on our truck, and we layer stain until the replacement boards disappear.
Book a free estimate. A moisture meter on the boards and a look at the subfloor from below tell us which strips truly have to go, and we show you.
Squeaky hallways and gaps along baseboard heaters are common in Ashland homes. Screws go down through the boards into the joists, and tinted filler closes the gaps.
Repairs are guaranteed for twelve months, and the installer doing the work is insured and NWFA trained.



From $150, with the exact figure set on site based on how many strips and what damaged them. You leave the free visit with a written price.
Yes. The floor is dried and metered for a few days; boards that stay cupped are replaced, the rest are left.
Not always. We inspect from below and above, dry it all, and replace only the strips that do not recover.
Yes. Almost every Ashland floor is red oak strip, so we keep it on the truck and layer the stain to match.
Trim head screws go through the boards into the joists, and the holes get putty tinted to the wood.
Yes. Radiator heat shrinks those boards, so we fill the seams with a flexible tinted filler that survives the seasons.
Usually the same week. Ashland is about fifteen minutes from our Natick store, and a small patch is often cut, set and coated by afternoon.
Twelve months on the repair; a patched board that lifts or opens a gap in that time is corrected at no charge.