Dustless Floor Refinishing
Our sanders are tied into a vacuum that drops dust into sealed bags. Afterward the crew clears the trim and ceiling before any stain goes on.
Our sanders are tied into a vacuum that drops dust into sealed bags. Afterward the crew clears the trim and ceiling before any stain goes on.
For a floor under 1,500 Sq Ft, count on 3 days with no stain or 4 with stain, plus a buffer day for damp weather. Wear socks after 24 hours and set furniture at 48.
Boards ruined by a leaking washer or a heavy dresser are removed and replaced from $150, then sanded level with the rest of the room.
The labor comes with a one year warranty from us, delivered by a licensed, insured and NWFA certified crew. Payment splits evenly, the first half on the morning sanding starts and the second at the final coat.

A clear coat with no tint keeps oak bright in a small bedroom.

Medium brown camouflages boot scuffs and dog hair where the family gathers.

A cool, smoky shade removes the orange glow from older red oak.

A golden tone with a trace of red warmth suits century homes near Templeton Center.

Rich walnut puts every grain line on display in a formal dining room.

Near black looks modern in a remodeled open plan, though dust shows up faster.



The $2.50/Sq Ft rate is flat and pays for the sanding, the stain and the three poly coats. Oak that only looks dull may need just a $1.00/Sq Ft screen and recoat.
Yes. It takes off the old amber finish, and a cooler stain pulls the floor toward brown. Samples go on your own floor so you can compare.
Under 1,500 Sq Ft, plan on 3 days, or 4 with stain, plus a cushion day. You can walk in socks after a day, and the table returns after two.
Outside or behind a closed door. The finish can take paws after 24 hours, and short nails protect it.
No. Sealed bags catch dust at the machine, and the crew vacuums the room before stain goes on.
Not necessarily. A spare key with a neighbor or a lockbox works, since the crew needs entry each day until the coats cure.
Fifty dollars a step, stain included, hand sanded to match the hall. Risers are not part of that figure.
No. Half is due when sanding begins, the rest after the last coat, and reserving a date is free.