Treads, Risers and Nosing
For homes close to Forest Avenue, record the rise, tread depth and nosing detail where each end of the flight meets the surface. Note which stair trim stays.
For homes close to Forest Avenue, record the rise, tread depth and nosing detail where each end of the flight meets the surface. Note which stair trim stays.
For homes close to Forest Avenue, view a finished tread sample beside the rail, riser and retained landing wood. Include the two landings.
For homes close to Forest Avenue, investigate movement at the existing tread and support before covering or replacing it. Note which stair trim stays.
For homes close to Forest Avenue, compare the stair workmanship terms and keep the recorded details of the replaced parts. Ask about the written terms.



Record each rise, tread depth and the height of the upper and lower floors. Include the lighting in a shaded room near the quarry.
In a home with an older entry and a later room, show how the posts attach to the stair. The installation plan needs to account for their location and support.
Take an individual tracing of each angled step and mark which edge meets the wall. Measure the floor by the joint at the original hallway tile.
In a home with an older entry and a later room, inspect the stair after lifting enough carpet to identify the base and confirm the dimensions.
Compare a dried tread sample beside the retained landing and rail under the same light. Check the clearance near Forest Avenue.
In a home with an older entry and a later room, investigate the connection and support before deciding which parts need repair or replacement.
Its finished thickness can move the walking surface relative to the landing. Measure the proposed assembly before ordering. Check the finish in a shaded room near the quarry.
In a home with an older entry and a later room, show the entire flight, both floor connections and the ends of the steps where trim or railings meet.