Treads, Risers and Nosing
Identify treads and risers included in the quote. Include the neighboring room when you take pictures. Ask how the layout will meet the surrounding rooms if needed.
Identify treads and risers included in the quote. Include the neighboring room when you take pictures. Ask how the layout will meet the surrounding rooms if needed.
Check whether the rail and old trim can stay. Confirm the point where the new project stops. Keep a record of any prior work on the floor.
Measure the landing levels ahead of choosing nose thickness. Show the estimator the edge that matters most. Confirm the floor work area ahead of scheduling a visit.
Keep stair work and adjacent floor work clear in the written quote. Confirm the work area ahead of scheduling a visit. Bring a floor plan to the site visit.



Start with the treads, risers and retained railing. Take a side view that shows the tread ends and the trim you plan to retain.
Point out the delivery door near East 116th Street in the photos you send. Take a side view that shows the tread ends and the trim you plan to retain.
Ask how the installer will handle the tread profile and landing heights. The stair scope separates replacement parts from the finish and any support work.
Inspect its depth, edges and support. Wear limited to the surface can call for a different approach than a loose or split piece.
Discuss who needs access before setting the schedule. Some stages require keeping people away from the work area.
Check how the tread end and nose meet the stringer or trim. Choose the return detail as part of the proposal.
Include a side view and pictures of both landings. Show damaged edges, rail attachments and any floor being changed.
Yes, if the scope accounts for where the surfaces meet. Measure the connection before deciding which work goes first.