Walkthrough Before We Start
Four kids, a goldendoodle and a front hall that sees every pair of wet cleats in March. A hard finished oak plank is built to outlast the whole parade.
Four kids, a goldendoodle and a front hall that sees every pair of wet cleats in March. A hard finished oak plank is built to outlast the whole parade.
Your lumber ships from our warehouse in Long Branch, NJ, and next-day delivery from Long Branch brings it up the Parkway corridor in time for the crew.
We arrive with oak, maple and engineered samples and kneel them on your own floor, where Woodcliff Lake daylight shows what the color really does.
Each install earns a one year labor warranty from us, with the mill covering the planks. We employ every installer ourselves, no hired-out crews.

White oak nailed over a fastened deck keeps a long center hall quiet in an older colonial.

Walkout levels cut into a hillside slab suit engineered planks floated over a thin pad.

Long gravel drives and steep front walks are no obstacle, because the crew carries every carton in by hand.

Nail and glue at $2.50/Sq Ft plus adhesive fits boards laid over plywood in a split level addition.

A pale European oak look in prefinished boards lifts a great room that faces the trees.

Mudrooms off the garage take salt and slush, so a harder prefinished coat belongs there.



The labor schedule is $2.25/Sq Ft nailed, $2.50 glued and nailed with adhesive extra, and $2.00 for floated engineered planks. Lumber from us lands unfinished at $5.50/Sq Ft installed or prefinished at $6.00.
Yes, once we confirm the deck is sound and dry from above and below. Weak sections are reinforced before any plank is set.
Engineered, floated at $2.00/Sq Ft of labor, because it tolerates a cooler slab. Save solid oak for the floors above grade.
We handle it for about $1.00/Sq Ft and haul it off. Squeaks and low spots are corrected beneath before boards go in.
Scheduling your estimate on our site takes $250 off. Having us move furniture is a flat $250.
Rooms of prefinished flooring tend to take a day or two. Raw oak that is sanded, stained and coated on site takes nearer a week.
It leaves our warehouse in Long Branch, NJ, and next-day delivery from Long Branch carries it to your Woodcliff Lake door.
Our own employees, licensed, insured and NWFA certified, with a one year labor warranty and the manufacturer warranty on the planks.