Walkthrough Before We Start
A Labrador shaking off after the yard, a soccer bag dumped in the hall and a pizza night that tips a glass. Oak with a hard finish carries on regardless.
A Labrador shaking off after the yard, a soccer bag dumped in the hall and a pizza night that tips a glass. Oak with a hard finish carries on regardless.
Everything is staged at our warehouse in Long Branch, NJ, and next-day delivery from Long Branch gets the boxes to your garage before the crew arrives.
Samples of oak, engineered and prefinished boards ride in with our crew and go beside your own paint and trim, so the choice happens under your Winslow Township windows.
Labor is under warranty for one year, and the boards carry the manufacturer's coverage. Only our own employees install, never subcontractors.

Oak fastened over a screwed down subfloor ends the bounce that shows up in two story hallways.

Engineered planks float across a finished basement slab with no nailing and no mess upstairs.

Boxes are carried from the garage straight to the room, so nothing sits in the driveway overnight.

Where a kitchen sits on plywood, nail and glue at $2.50/Sq Ft plus adhesive keeps the boards from drifting.

A light prefinished oak brightens a great room with a vaulted ceiling and lots of glass.

A hard satin coat takes the grit that comes in from the Pinelands trails.



Plan on $2.25/Sq Ft of labor for nail down, $2.50 with adhesive extra for nail and glue, and $2.00 for floating engineered plank. Bring our boards into it and the finished price is $5.50/Sq Ft unfinished or $6.00/Sq Ft prefinished.
Yes, because we screw the subfloor to the joists before any board goes down. That prep is what stops the bounce.
A floated engineered plank is the right answer there, at $2.00/Sq Ft of labor. A moisture check of the slab comes first.
We do, at about $1.00/Sq Ft, and the pad and staples leave with us.
Moving furniture is optional and a flat $250. Booking the estimate online separately takes $250 off.
Two prefinished bedrooms generally wrap up in about two days. Unfinished oak that is sanded and coated at the house needs closer to a week for the coats to cure.
Our warehouse in Long Branch, NJ, delivered the next day after you order.
Our payroll employees do the work. You receive a one year warranty on labor plus the manufacturer's warranty on the material.