Walkthrough Before We Start
Old farmhouses settle, so before a nail goes in our lead walks each room with a level, presses on the subfloor and checks every threshold from kitchen to hall.
Old farmhouses settle, so before a nail goes in our lead walks each room with a level, presses on the subfloor and checks every threshold from kitchen to hall.
Licensed, insured and NWFA certified, each installer is on the Brazil Floors payroll, which means nobody working in your house is a stranger hired for the week.
Day one starts with a remeasure and cartons staged room by room, with trim and reducers within arm's reach, so the nailer keeps moving instead of searching the truck.
You get a year of labor warranty from us plus the mill's own warranty on the boards, so the workmanship and the wood each have someone standing behind them.

Planks that follow the longest wall waste the least wood and stretch a narrow front room.

Short boards turned into a zigzag give an entry hall a handmade, period feel.

Boards cut to matching angles close in a sharp V, a good match for a newer open kitchen and family room.

Planks set at 45 degrees pull the eye to the far wall and make a small bedroom read wider.

Oak squares with the grain alternating give a library or sunroom a retro parquet finish.

Short pieces woven over and under, usually inside a contrasting border, add detail to a dining room near Post Office Square.



For a West Newbury nail-down floor, labor is $2.25/Sq Ft with the nails and underlayment inside that figure. Add the boards through us and the package is $5.50/Sq Ft for unfinished oak or $6.00/Sq Ft prefinished.
Usually yes. We find the low spots with a level, fasten down loose subfloor and shim or flatten where needed, and any extra prep is written into your estimate before work starts.
Floating engineered hardwood, glued at the joints over underlayment, so nothing is nailed into the concrete. The labor is $2.00/Sq Ft.
We do. Removal of old flooring runs about $1.00/Sq Ft, and the crew confirms it when they look at the room during your free in-home estimate.
Material is delivered next day from our Natick warehouse. Unfinished oak should rest in the house before nailing, and we plan that around your calendar.
Yes, for a flat $250. The crew shifts the pieces out, puts them back and wraps up before they leave.
Labor is due when the crew arrives to start. Material is paid when the boxes are delivered, and nothing is collected just to hold a date.
Brazil Floors backs the labor for one year, and the manufacturer covers the boards. Every installer who comes to your house is licensed, insured and NWFA certified.