Walkthrough Before We Start
Leaf litter off the trails, a husky's winter coat and damp boots by the back door. Hardwood under a hard finish handles it all and still looks good.
Leaf litter off the trails, a husky's winter coat and damp boots by the back door. Hardwood under a hard finish handles it all and still looks good.
Stock is loaded at our warehouse in Long Branch, NJ, and next-day delivery from Long Branch puts it in your garage before the installers show up.
Oak, maple and engineered samples travel to your house, and we set them on your own subfloor so the tone is judged in the light of your own windows.
Labor is warranted for one year, and the wood has its maker's warranty on top. Employees of ours do the work, and no subcontractor ever does.

Red oak laid over a freshly fastened subfloor ends the bounce and creak in older cape bedrooms.

Floating planks over a basement slab give a den the look of wood without nails in the concrete.

Steep driveways on the Wanaque hills are no obstacle, because the crew hand carries each bundle inside.

Boards laid on plywood in a split level are nailed and glued at $2.50/Sq Ft plus adhesive.

A pale prefinished oak lightens a living room that faces the wooded hillside.

A hard finish keeps up with trail mud and wet paws in an entry hall.



In Wanaque we charge $2.25/Sq Ft for nail down labor, $2.50 plus adhesive for nail and glue, and $2.00 for a floated engineered floor. Adding our boards gives $5.50/Sq Ft unfinished or $6.00 prefinished.
Yes. We shim and level the low areas and secure loose subfloor before laying anything, and we plan that at the first visit.
The safer route is engineered planks floated on a moisture barrier, with labor at $2.00/Sq Ft. A moisture test on the slab comes before any product suggestion.
Removal costs about $1.00/Sq Ft and we haul the waste. Weak spots and squeaks are repaired before the new boards go in.
A booking made online takes $250 off the estimate. Want the couches moved too? We do that for $250 flat.
One or two days for prefinished rooms. Raw boards that get sanded and coated after install need about a week.
Our Long Branch, NJ warehouse supplies it, and next-day delivery from Long Branch follows your order.
Our own employees, never subcontractors. Labor is warranted for a year, and the mill stands behind the wood itself.