Walkthrough Before We Start
At a prewar hallway turn, check the surface before fitting.
At a prewar hallway turn, check the surface before fitting.
At a stone apartment saddle, choose a sample under daylight.
Near Lincoln Square, measure the finished floor height.
For a prewar hallway turn, ask which work is covered.

At a prewar hallway turn, follow the hallway line.

At a managed service lobby, center herringbone on the opening.

For a room near Lincoln Square, check the chevron center seam.

For a managed service lobby, mark where angled planks end.

If you have a managed service lobby, compare grain between adjacent squares.

At a managed service lobby, compare alternating basket groups.
Near Riverside Drive, allow $2.25/Sq Ft.
Oak for Riverside Drive can arrive next day.
Give oak three days at Riverside Drive. Install on day four.
Check clearance by Riverside Drive before removing casing.
Use Riverside Drive as your grain sightline.
Test both widths beside Riverside Drive.
Check below Riverside Drive for flatness and support.
Try a sample near Riverside Drive under your lamps.