Walkthrough Before We Start
Barn boots by the back door, a lab shaking off after the field and a table full of Sunday guests. Oak with a hard finish carries that load for decades.
Barn boots by the back door, a lab shaking off after the field and a table full of Sunday guests. Oak with a hard finish carries that load for decades.
Your boards leave our warehouse in Long Branch, NJ, and next-day delivery from Long Branch puts the stack in your hall before the crew shows up.
Our samples ride out to your house, and we lay oak, engineered and prefinished boards against your trim so you judge the tone in your own light.
Labor is covered for a full year, and the boards come with the manufacturer's warranty. Our own employees run every install, with no subcontractors.

Old pine subfloors in farmhouse halls are fastened down first, so the new oak stays quiet.

Additions built on slabs take floating engineered planks, which sit flat without a nail.

Narrow back doors and mudrooms are fine, since our crew hand carries every bundle inside.

Nail and glue at $2.50/Sq Ft plus adhesive holds boards over plywood where the joists run far apart.

A pale prefinished oak brightens a farmhouse dining room with small windows.

Mud season tracks grit in all day, so a hard finish on the entry boards earns its keep.



Expect $2.25/Sq Ft to nail down, $2.50 to nail and glue with adhesive extra, and $2.00 to float engineered planks. Using our boards, the installed figure becomes $5.50/Sq Ft for unfinished oak or $6.00 for prefinished.
Yes, once we shim the low joists and fasten the subfloor. Old frames move, so we measure the slope at the estimate.
A floating engineered plank over a moisture barrier is the safer choice on a slab, and labor is $2.00/Sq Ft. Solid oak would need a plywood base first.
Yes. Tear-out costs about $1.00/Sq Ft and the old material rides away on our truck. Soft spots get repaired before any board is laid.
It takes $250 off the estimate. Not keen on dragging sofas and dressers? Our crew moves them for a flat $250.
Prefinished rooms usually take a day or two. Unfinished oak that gets sanded and coated in the house keeps us there closer to a week.
Every order ships out of our warehouse in Long Branch, NJ, and next-day delivery from Long Branch brings it to the house.
Our own crews, never subcontractors, with one year on labor and the manufacturer warranty on the wood.