Walkthrough Before We Start
Mud tracked in from the field, a lab shaking off a creek swim and grandkids on the kitchen floor. Hard finished oak keeps its grain through all of it.
Mud tracked in from the field, a lab shaking off a creek swim and grandkids on the kitchen floor. Hard finished oak keeps its grain through all of it.
Your order leaves our warehouse in Long Branch, NJ, and arrives next day, so the crew starts with every carton already stacked in the room.
Samples come to your door in oak, engineered and prefinished. We lay them on your own floor so you judge the color under your Pilesgrove windows, not a showroom bulb.
Labor is covered for a full year, while the boards keep the maker's warranty. Our payroll crew works from first row to last, never subcontractors.

Plank subfloors in old farmhouses are screwed tight before oak goes over them, so the hall stops flexing.

Engineered boards float across the concrete of a ranch addition without nailing into the slab.

Long gravel drives and porch steps are no obstacle, because our crew carries every carton in by hand.

Nail and glue at $2.50/Sq Ft plus adhesive suits oak laid over plywood in a split level.

A wide plank in a warm brown tone gives a country kitchen an updated, finished look.

Satin polyurethane over the foyer boards shrugs off muddy work boots through every wet spring.



Labor for a Pilesgrove nail down job runs $2.25/Sq Ft, glue assisted jobs $2.50/Sq Ft plus adhesive, and floated engineered $2.00/Sq Ft. If the boards come from us, expect $5.50/Sq Ft for unfinished or $6.00/Sq Ft for prefinished.
Yes. We shim or level the low areas and fasten any loose subfloor first. A house that has stood a century has moved, and we plan for that at the estimate.
Engineered planks floated over a moisture barrier are the answer there, at $2.00/Sq Ft of labor. Solid oak needs a wood subfloor.
Yes, at about $1.00/Sq Ft, and the old material leaves with us. Any soft patch or squeak found underneath gets repaired first.
Book the estimate on our site and $250 comes off. If you want furniture shifted, that is a flat $250.
Factory finished boards in two rooms are usually done within a couple of days. Site finished oak with sanding and coats stretches to about a week.
Boxes ship from our warehouse in Long Branch, NJ, and reach you through next-day delivery from Long Branch after the order is placed.
Only our own employees, never subcontractors. Our workmanship is warranted for a year, and the manufacturer stands behind the boards.