Walkthrough Before We Start
Sandy flip-flops, a wet dog after the beach and rolling coolers on the way to the Boardwalk. Oak under a tough finish takes that pounding all summer.
Sandy flip-flops, a wet dog after the beach and rolling coolers on the way to the Boardwalk. Oak under a tough finish takes that pounding all summer.
Material ships out of our Long Branch, NJ warehouse and reaches Ocean City with next-day delivery from Long Branch, which keeps a rental turnover or a closing date on track.
The samples come to your door, and we set oak, maple and engineered boards against your own walls so you can judge the tone in genuine bay light.
The labor behind your floor is guaranteed for a year, and the boards come with the manufacturer's own warranty. Every installer is a licensed, insured member of our staff.

Oak laid over a tightened subfloor ends the hollow, creaky feel of upstairs hallways in older beach cottages.

Engineered planks float over concrete in a ground level townhouse and handle the damp air coming off the bay.

Outside staircases and narrow beach block lots do not slow the crew, because cartons are carried in by hand.

Nail and glue at $2.50/Sq Ft plus adhesive suits boards bonded to plywood in a raised beach house.

A pale prefinished oak gives a summer rental a light, breezy feel that hides sand better than dark wood.

Salt air, sand and heavy summer traffic ask for a hard satin finish at the entry.



On the island, labor is $2.25/Sq Ft for nail-down, $2.50 for nail and glue with adhesive added, and $2.00 for floated engineered planks. Boards bought from us bring the installed total to $5.50/Sq Ft raw or $6.00/Sq Ft prefinished.
It moves wood a little, so we let planks settle in the house and leave the proper expansion gap. A hard finish keeps moisture from creeping in.
Engineered planks floated over a dry slab with a vapor barrier are the safe route. Our estimator checks the moisture level before recommending anything.
Yes, for about $1.00/Sq Ft, with hauling included. Any soft subfloor gets repaired first.
Yes, the website booking for your estimate comes with a $250 credit. Shifting your furniture is a separate flat $250.
Plan on roughly two days for a pair of prefinished rooms. Raw oak that is sanded and coated on site takes close to a week.
It leaves our Long Branch, NJ warehouse, and delivery to Ocean City is next-day from Long Branch.
Salaried Brazil Floors installers handle everything and no subcontractors ever appear. Labor is guaranteed for twelve months, and the lumber maker covers the boards.