Walkthrough Before We Start
Strollers rolled in from the sidewalk, a Saturday of relatives visiting and wet shoes left at the door. Oak with a durable finish keeps going through all of it.
Strollers rolled in from the sidewalk, a Saturday of relatives visiting and wet shoes left at the door. Oak with a durable finish keeps going through all of it.
Boxes sit at our warehouse in Long Branch, NJ, and next-day delivery from Long Branch brings them over, so the installers start on time.
We bring oak, walnut and engineered samples to your apartment and lay them across your floor, so the color is judged beside your furniture and the daylight off the river.
One year of warranty covers our labor, and the manufacturer stands behind the boards. Employees on our payroll set every floor, with no subcontractors.

Oak nailed over a re-fastened subfloor silences the squeaks of older walk-up apartments.

Floated planks over a sound-rated pad keep footsteps from carrying to the unit beneath.

Steep walk-up stairwells are manageable because our installers carry every bundle up by hand.

Nail and glue at $2.50/Sq Ft plus adhesive keeps boards flat over plywood in a duplex.

A pale prefinished oak makes a narrow city living room look wider and brighter.

Apartment entries take a hard satin finish that tolerates grit from the street.



Expect $2.25/Sq Ft of labor for nail down, $2.50 plus adhesive for nail and glue, and $2.00 for floated engineered. Add our boards and installed pricing is $5.50/Sq Ft unfinished or $6.00 prefinished.
Usually yes, with a floated engineered floor and an approved sound pad. Hand us the board requirements and the work hours and we plan the job around them.
Not for us. Two installers carry bundles up the stairs by hand, so a steep stairwell only adds a little time.
Yes, we pull it up for roughly $1.00/Sq Ft and load the waste onto our truck. Soft or noisy areas of subfloor are repaired before the first strip.
Booking the estimate online takes $250 off. A flat $250 also covers moving the furniture out and back.
Prefinished oak in a one bedroom is often done in two days. Raw oak sanded and coated on site stretches to about a week with curing.
It is stored in our warehouse in Long Branch, NJ, and travels over by next-day delivery from Long Branch once you place the order.
Our own employees, with a one year labor warranty and the manufacturer warranty on the oak.