Walkthrough Before We Start
Review material choices beside a floor that passes under two original casings near the Route 20 corridor through New Lebanon. Compare wood thickness, joint profiles and the direction of the retained planks.
Review material choices beside a floor that passes under two original casings near the Route 20 corridor through New Lebanon. Compare wood thickness, joint profiles and the direction of the retained planks.
Use the room’s light to check each sample near the Route 20 corridor through New Lebanon. Leave room at the threshold for the selected hardwood buildup.
We measure the room and adjoining edges at your New Lebanon estimate. Inspect the supporting floor and choose an approved fitting method for the boards.
At the New Lebanon estimate, ask which installation or finishing work is covered and how to care for the new surface.

Compare wood thickness, joint profiles and the direction of the retained planks for a project near the Route 20 corridor through New Lebanon.

Inspect the supporting floor and choose an approved fitting method for the boards for a project near the Route 20 corridor through New Lebanon.

Leave room at the threshold for the selected hardwood buildup for a project near the Route 20 corridor through New Lebanon.

Keep a photo of the adjoining surface and any trim that must remain for a project near the Route 20 corridor through New Lebanon.

Record the rooms you want to keep open while the crew works for a project near the Route 20 corridor through New Lebanon.

Use a sample to confirm appearance in the room’s usual light for a project near the Route 20 corridor through New Lebanon.



Ask for the species, dimensions and fitting method in writing. Confirm who supplies the boards and which transitions, trim and prep are included. For a floor that passes under two original casings, point out the exact spot during the estimate.
Start with the finished heights and direction of both floors. If the joint profiles differ, discuss a suitable saddle or transition at the room boundary.
Bring the product specifications and carton labels to the estimate. The fitting method and required supplies depend on the material and supporting surface. At the visit, show us a floor that passes under two original casings and the floor beside it.
Consider the substrate, moisture readings and the manufacturer’s approved installation methods. Compare samples against the floor and trim you intend to keep.
Follow the board maker’s acclimation and jobsite requirements. The installer should check the flooring and subfloor moisture before fastening boards. At the visit, show us a floor that passes under two original casings and the floor beside it.
Have the existing surface checked for movement, moisture and height. The chosen hardwood system determines what can remain and what must come up.
Share the narrowest doorway and any landing turns. Give the crew the approved delivery entrance and a suitable indoor location for the flooring. For a floor that passes under two original casings, point out the exact spot during the estimate.
The answer depends on the flooring assembly and whether finish is applied on site. Ask the crew to put the return-to-use instructions in the estimate.