Walkthrough Before We Start
Near The Hub, walk through the room first.
Near The Hub, walk through the room first.
By East 149th Street, test the sheen in shadow.
By a short elevator opening, record the narrowest doorway.
Near The Hub, read the product care guide.

At a shared building hall, set straight oak rows.

At a shared building hall, compare shorter herringbone lengths.

By a short elevator opening, check the chevron center seam.

If your home is by The Hub, mark where angled planks end.

Near Third Avenue, compare grain between adjacent squares.

By Third Avenue, compare alternating basket groups.
Near The Hub, allow $2.25/Sq Ft.
Oak for Third Avenue can arrive next day.
Give oak three days at Third Avenue. Install on day four.
Check clearance by Third Avenue before removing casing.
Use The Hub as your grain sightline.
Test both widths beside The Hub.
Check below The Hub for flatness and support.
Try a sample near The Hub under your lamps.