Walkthrough Before We Start
Wet snow boots at the door, a woodstove that never stops and a hound who likes to slide down the hall. Oak with a hard finish is built for that life.
Wet snow boots at the door, a woodstove that never stops and a hound who likes to slide down the hall. Oak with a hard finish is built for that life.
Everything ships from our warehouse in Long Branch, NJ, and next-day delivery from Long Branch drops the cartons off before the crew needs them.
Sample boards of oak, hickory and engineered wood ride along with the estimator, and we line them up against your own trim so the tone is judged in your Warren County light.
Our labor comes with a one-year warranty, and the mill backs the lumber. People on the Brazil Floors payroll lay every board, since we never hire subcontractors.

Oak fastened to a tightened subfloor quiets the creaks that old Port Murray farmhouse floors pick up.

Engineered planks float across a walkout basement slab and cope with Warren County humidity swings.

Steep gravel drives and tight porches are manageable because our crew carries each bundle in by hand.

A raised ranch over plywood takes nail and glue at $2.50/Sq Ft plus adhesive.

A kitchen that faces the ridge looks warm in a pale prefinished oak.

Road salt and wet boots from the long winter punish soft coatings, so the entry boards get a hard finish.



Labor is $2.25/Sq Ft for a nail-down job, $2.50 plus adhesive for nail and glue, and $2.00 for floating engineered. Our boards raise the total to $5.50/Sq Ft unfinished or $6.00 prefinished.
Yes, once low spots are built up and the loose subfloor is refastened. An old house moves with the decades, so we plan around that during the first visit.
Engineered boards floated over a moisture barrier are the common answer at $2.00/Sq Ft of labor. Solid oak needs plywood beneath, and we talk through both at the estimate.
Yes, removal costs about $1.00/Sq Ft and our truck carries it off. Squeaks and soft spots are corrected before any new board is laid.
Reserve the estimate on our site and $250 comes off the price. Our flat $250 furniture move is there if you would rather not shift anything.
A pair of prefinished rooms takes about two days. Unfinished oak sanded and sealed in place takes closer to a week.
In our warehouse in Long Branch, NJ, and it reaches you through next-day delivery from Long Branch after you order.
Brazil Floors employees, never subcontractors, with a one-year labor warranty and the mill warranty on the wood.