Walkthrough Before We Start
Thames River humidity and salt air off the Sound keep summers damp, so the oak sits in your house until a meter shows it matches the subfloor. The first row waits for that reading.
Thames River humidity and salt air off the Sound keep summers damp, so the oak sits in your house until a meter shows it matches the subfloor. The first row waits for that reading.
The installers on your Ledyard floor are Brazil Floors employees, licensed, insured and NWFA certified. No second company is involved.
Rooms are measured corner to corner and cartons, trim and reducers are stacked in the order they go down. The crew never stops to hunt for a transition piece.
Twelve months of labor warranty from us plus the manufacturer warranty on the oak, both starting when the last threshold is set.

Boards follow the longest wall, the quickest layout with the least waste, and they lengthen a Gales Ferry living room.

Short boards laid in a stepped zigzag, every piece trimmed individually. A fine look for a dining room near Ledyard Center.

Rows mitered into a sharp V down the center, suited to the open kitchens in the newer homes near Long Pond.

A 45 degree run widens a narrow galley kitchen in a Gales Ferry ranch.

Oak squares with alternating grain, classic parquet, right for a den on Christy Hill.

Short oak pieces woven inside a darker border, a pattern for the front rooms of the older Ledyard Center colonials.



Nail down runs $2.25/Sq Ft of labor, nail and glue $2.50 and floated engineered $2.00. If we supply the oak, unfinished is $5.50/Sq Ft installed and prefinished $6.00.
It can if boards go down too soon. We let them sit in your house and nail only when the meter matches the subfloor.
Engineered oak floated over a pad is the one option there, at $2.00/Sq Ft of labor. Solid oak stays upstairs.
We do, for roughly $1.00/Sq Ft, hauling included. Loose plywood gets screwed and low spots leveled before the oak.
Book through the website and $250 comes off the installation. Furniture can be moved by us for a flat $250.
Prefinished oak in a few rooms is usually done in one or two days. Unfinished oak that gets sanded and finished in place takes about a week.
People on the Brazil Floors payroll who hold our license, insurance and NWFA certification. No Ledyard job goes to a subcontractor.
A year on our labor and the manufacturer warranty on the boards, both counted from the day we finish.