Walkthrough Before We Start
Think of ski boots in January, a lab shaking off the reservoir trail and grandkids on the stairs. Oak with a hardy finish keeps pace with all of it.
Think of ski boots in January, a lab shaking off the reservoir trail and grandkids on the stairs. Oak with a hardy finish keeps pace with all of it.
Cartons are held at our warehouse in Long Branch, NJ and shipped with next-day delivery from Long Branch up the hills to your driveway.
Bring the samples to the table? We bring them to the floor instead, setting oak and engineered boards on your own subfloor under your own windows.
A one year labor warranty comes with the install, and the lumber has the mill's guarantee. The nailers are our staff, always.

A farmhouse sagging at one wall is built back to flat with shims, then the oak lies true.

Walkout lower levels on a hillside lot take floating planks that stay stable through wet seasons.

A winding driveway adds distance, not trouble, because the crew walks each bundle to the room.

Over a plywood base in a 1970s split, nail and glue at $2.50/Sq Ft plus adhesive stops hollow sounds.

Pale prefinished boards lift the light in a wooded-lot home that gets little sun.

Snow, salt and sand reach the entry first, which is why that stretch gets a hard finish.



Nailing down is $2.25/Sq Ft for labor, nail and glue is $2.50 plus adhesive, and a floating engineered floor is $2.00. Buying boards from us gives $5.50/Sq Ft unfinished and $6.00 prefinished, installed.
We measure the swing, then plane or shim until the surface is flat enough for oak. Houses on a slope settle unevenly, so this step is routine for us.
Yes, usually engineered planks floated over a barrier, at $2.00/Sq Ft of labor. Solid oak does poorly where moisture moves through the slab.
Removal is separate, about $1.00/Sq Ft, and the debris goes on our truck. Soft or noisy plywood is repaired as part of that stage.
Put the estimate on the calendar through our website and the job drops by $250. Should you want help clearing rooms, furniture moving is a flat $250.
Two prefinished rooms usually fit in a day or two. Raw boards sanded and sealed inside the house take most of a week.
Everything starts at our warehouse in Long Branch, NJ, and arrives by next-day delivery from Long Branch after you order.
Never. Salaried crew members install, with a year of labor coverage plus the mill warranty on your boards.