Walkthrough Before We Start
Jets climbing out of Teterboro rattle the windows, kids cut through the kitchen to the yard and the dog skids around the corner. Oak with a hard finish ignores all of it.
Jets climbing out of Teterboro rattle the windows, kids cut through the kitchen to the yard and the dog skids around the corner. Oak with a hard finish ignores all of it.
Everything is staged in our warehouse in Long Branch, NJ, and next-day delivery from Long Branch brings it to your curb, so boards are never the reason a job slips.
Oak, engineered and prefinished samples come in the door with us, and we lay them against your walls and radiators so you see the tone in your own light.
Our labor is warranted for one year after the last board is set, and the mill adds its warranty on the wood itself. The ones on your floors are our employees, never subcontractors.

Oak laid over a flattened subfloor silences the squeaky hallways that older Bergen County colonials develop.

Engineered planks float over concrete in garden apartments and come with a pad that softens footsteps for neighbors.

Tight stoops and narrow front halls on the older streets cause no delay, because every box goes in by hand.

At $2.50/Sq Ft plus adhesive, nail and glue is how we fasten boards over plywood in a postwar Cape.

A warm walnut stain on oak lifts a dining room that has plaster walls and original trim.

Heat from radiators dries wood fast in winter, so we leave expansion gaps and choose seasoned boards.



Nail down labor is $2.25/Sq Ft, nail and glue is $2.50 plus adhesive, and floating engineered work is $2.00. Choose our boards and the installed price is $5.50/Sq Ft unfinished or $6.00/Sq Ft prefinished.
Yes, since we work from the floor up and protect walls and trim. Old subfloors get leveled and fastened first, so the new oak stays quiet.
Engineered planks floated over a sound pad are the usual choice, at $2.00/Sq Ft of labor. Bring your building rules to the estimate and we plan around them.
Removal runs near $1.00/Sq Ft, and our truck takes the old material when it leaves. Any squeak or soft area gets repaired first, ahead of the new boards.
The estimate booked online takes $250 off. A flat $250 covers moving your furniture if you want it done.
A pair of prefinished rooms normally takes one to two working days. Raw oak sanded and sealed in place needs closer to a week.
It waits at our warehouse in Long Branch, NJ, and arrives with next-day delivery from Long Branch once you order.
Our own insured, licensed employees, with no subcontractors in the picture. You receive one year on labor plus the maker's warranty on the boards.