Walkthrough Before We Start
Woodstove ash, snow packed boots and a barn cat that naps by the register. A hard finished oak floor takes the whole country routine.
Woodstove ash, snow packed boots and a barn cat that naps by the register. A hard finished oak floor takes the whole country routine.
Boxes are stocked at our warehouse in Long Branch, NJ and travel out to Warren County with next-day delivery from Long Branch, so the crew keeps working.
We drive samples to the house and set oak, hickory and engineered boards on your actual subfloor, so you judge the tone in the light of your own windows.
Workmanship has a one year labor warranty and the lumber keeps its mill warranty. Everyone on site is on our payroll.

Fastened plank subfloors stop the groans that old hill country farmhouses are known for.

Engineered planks float over a tested slab in a walkout level with no nails or glue.

Steep gravel drives and narrow doors pose no problem, because each carton is carried in by hand.

Nail and glue is $2.50/Sq Ft plus adhesive and works for boards laid over plywood in a ranch addition.

A pale prefinished oak brightens a dim kitchen that faces the woods.

A hard finish by the mudroom door protects the first stretch of boards from gravel and snowmelt.



Labor is $2.25/Sq Ft for nail down, $2.50/Sq Ft plus adhesive for nail and glue, and $2.00/Sq Ft for floated engineered. Our boards put installed pricing at $5.50/Sq Ft unfinished and $6.00/Sq Ft prefinished.
Yes, once low joists are shimmed and loose planks are fastened. Old frames shift over generations, so we measure the pitch at the first visit.
Engineered boards floated over a vapor barrier are the standard answer, at $2.00/Sq Ft of labor. The slab is tested for moisture before any order.
Yes, removal costs about $1.00/Sq Ft and our truck carries off every scrap. Weak spots in the subfloor are secured first.
Reserving the estimate online takes $250 off. Handing furniture to our crew costs a flat $250.
Allow one or two days when the boards arrive prefinished. Raw oak that is sanded and coated in the house needs nearly a week.
At our warehouse in Long Branch, NJ, with next-day delivery from Long Branch after you order.
A licensed, insured crew on our payroll, with nobody subcontracted. You get a one year labor warranty plus the lumber maker's warranty.