Walkthrough Before We Start
If your home is by Hillside Avenue, check the surface before fitting.
If your home is by Hillside Avenue, check the surface before fitting.
By Hillside Avenue, view two samples under room lighting.
For an enclosed porch, record the narrowest doorway.
If your home is by 252nd Street, review the written work scope.

By Hillside Avenue, align the plank ends.

For a garden-level doorway, compare shorter herringbone lengths.

By a narrow side passage, check the chevron center seam.

If you have a narrow side passage, mark where angled planks end.

By Bellerose, compare grain between adjacent squares.

If you have an enclosed porch, count full basket repeats first.
Near 252nd Street, allow $2.25/Sq Ft.
Oak for Hillside Avenue can arrive next day.
Oak needs three days at 252nd Street. Fit on day four.
Check clearance by Hillside Avenue before removing casing.
Use 252nd Street as your grain sightline.
Test both widths beside 252nd Street.
Check below 252nd Street for flatness and support.
Try a sample near 252nd Street under your lamps.