Walkthrough Before We Start
Near the Brooklyn Bridge approach, check room levels and the base when planning the layout. For a visit near Worth Street, review adjacent floor levels.
Near the Brooklyn Bridge approach, check room levels and the base when planning the layout. For a visit near Worth Street, review adjacent floor levels.
Before booking near Foley Square, choose an installation method suited to the structure. Match the subfloor assembly at the Worth Street estimate.
When planning hardwood floor installation near the Brooklyn Bridge approach, compare flooring widths and stair joins. Sketch two possible plank layouts.
At the Foley Square visit, ask how labor coverage applies. Check the wood's acclimation conditions.

At the Chambers Street visit, run straight rows along a clear sightline. Measure the lowest door edge.

Balance herringbone at the room center near Chambers Street. Map plank direction.

For a property near Chambers Street, test chevron at the main opening. Map plank direction.

Near Chambers Street, mark the longest diagonal run at the first visit. Measure the lowest door edge.

For a property near Chambers Street, center the checkerboard within clear edges. Map plank direction.

At the Worth Street visit, check basket weave beside retained trim. Sketch two possible plank layouts.
Map plank direction near Centre Street. Check what the framing supports.
Near Worth Street, compare both hardwood constructions and match the subfloor assembly.
Measure the lowest door edge near City Hall Park before work.
Mark the trim that stays near City Hall Park at the doorway.
Check the wood's acclimation conditions near Centre Street with a sample.
Measure the finished landing height near City Hall Park before setting the scope.
Sketch two possible plank layouts near the Brooklyn Bridge approach before setting the scope.
Confirm the $2.25/Sq Ft labor rate near Centre Street while planning.