Walkthrough Before We Start
Backpacks dropped at the door, a beagle racing for the yard and a sofa pushed back every weekend. A hard finished oak floor takes that routine in stride.
Backpacks dropped at the door, a beagle racing for the yard and a sofa pushed back every weekend. A hard finished oak floor takes that routine in stride.
Cartons are pulled from our warehouse in Long Branch, NJ, and next-day delivery from Long Branch gets them to your driveway before the install day.
Oak, maple and engineered samples ride along to your house, and we hold them against your trim and windows so you see how each looks in Cinnaminson daylight.
One year covers our labor, and the manufacturer stands behind the boards. The people laying your floor are on our payroll.

Red oak nailed across a leveled subfloor brings back a ranch hallway that has creaked for sixty years.

Engineered planks float across a slab family room and take on seasonal swings without cupping.

Narrow doorways and short driveways are no trouble, since our crew hauls every box inside by hand.

Nail and glue at $2.50/Sq Ft plus adhesive suits boards laid over plywood in a split level near Route 130.

A pale prefinished oak lifts the mood of a ranch living room that gets little sun.

Wet boots from the school run call for a tough finish on the entry boards.



For Cinnaminson jobs, nail down labor costs $2.25/Sq Ft, nail and glue costs $2.50 plus adhesive, and a floated engineered floor costs $2.00. Supplying the wood ourselves brings it to $5.50/Sq Ft unfinished or $6.00 prefinished.
Yes, once we stiffen the bounce by fastening the subfloor and leveling the low areas. We check it at your free visit.
Floating engineered boards over a vapor barrier are the safe route, at $2.00/Sq Ft of labor. Solid nail down needs a wood subfloor.
Yes, for about $1.00/Sq Ft, and the debris is gone by evening. Loose spots and squeaks are repaired before new wood arrives.
Reserve your estimate through the website and $250 comes off. Moving the furniture out and back is a separate flat $250.
A pair of prefinished rooms generally wraps up inside two days. Raw oak sanded and finished in place can take most of a week.
They leave our warehouse in Long Branch, NJ, and reach Cinnaminson by next-day delivery from Long Branch.
Our own licensed, insured crew, with one year on labor and the maker's warranty on the wood.