Walkthrough Before We Start
Commuters shaking off rain at the door after the Raritan Valley Line, a teenager's bike parked in the hall and Sunday dinners for ten. Oak with a hard finish copes with all of it.
Commuters shaking off rain at the door after the Raritan Valley Line, a teenager's bike parked in the hall and Sunday dinners for ten. Oak with a hard finish copes with all of it.
Orders leave our warehouse in Long Branch, NJ, and next-day delivery from Long Branch gets the boxes to your driveway in time for the crew.
We come with oak, maple and engineered samples and lay them next to your baseboards and windows, so the color you pick is the one you will see in your own rooms.
The labor is guaranteed for a full year, and the manufacturer stands behind the boards. Only our own employees work in your house.

Oak strips nailed across leveled joists quiet the creaks that older Bound Brook hallways are known for.

Engineered boards float over a concrete base in newer townhouses without disturbing the neighbors below.

Tight side streets near Main Street are no obstacle, since our crew hand carries every box through the door.

Nail and glue at $2.50/Sq Ft plus adhesive suits boards laid over plywood in a mid-century ranch.

A pale prefinished maple lifts a narrow dining room that gets only a little light from the side window.

Front hallways take the worst of the traffic, so they get a harder finish than the bedrooms.



Our labor is $2.25/Sq Ft to nail down, $2.50 plus adhesive to nail and glue, and $2.00 to float engineered boards. If we also supply the wood, unfinished oak is $5.50/Sq Ft complete and prefinished is $6.00.
In most cases yes, because we sister or shim low joists and fasten loose subfloor before any oak is laid. We map the slope during the first visit so you hear the plan up front.
If moisture is a concern we pick engineered boards and a vapor barrier, which handles seasonal humidity better. We take readings at the estimate and tell you honestly which product fits.
We tear it out for about $1.00/Sq Ft and remove it from the property. Staples, tack strips and glue residue go with it.
We hold samples against the existing boards, then adjust the stain until both rooms read the same. A sanded and recoated pair of rooms blends best.
Prefinished rooms usually take one to three days. Site finished oak needs roughly a week because of curing between coats.
It does, since booking your estimate through the website takes $250 off. Material bought through us can also carry up to 30% off.
They are our own licensed, insured employees, never hired out. The work carries a one year labor warranty and the boards have the maker's coverage.