Walkthrough Before We Start
A bag of wet towels in the mudroom, sandy sneakers and a springer spaniel back from the beach. An oak floor with a hard finish forgives every one of them.
A bag of wet towels in the mudroom, sandy sneakers and a springer spaniel back from the beach. An oak floor with a hard finish forgives every one of them.
Boards come from our Long Branch, NJ warehouse the next day, a short run up the coast, so your crew never waits on material.
We carry oak, engineered and prefinished samples into the house and lay them on your floor, so you see the true tone in the light off the bay.
Twelve months of labor coverage come with the job, and the boards have their own maker's warranty. Our installers are employees, licensed, insured and NWFA certified.

Red oak nailed over a re-fastened subfloor puts an end to the creak in an old cottage hallway.

Engineered planks handle the damp air off Barnegat Bay and stay stable through the seasons.

Wraparound porches and steep stairs are no trouble for a crew that carries every bundle inside.

Nail and glue at $2.50/Sq Ft plus adhesive is the method for boards laid over plywood in a second floor bedroom.

A bleached prefinished oak gives a bayside living room that bright, airy summer look.

A hard satin finish takes the sand and salt that follow people in from the beach all season.



Expect $2.25/Sq Ft of labor for nail down, $2.50/Sq Ft plus adhesive for nail and glue, and $2.00/Sq Ft for a floating engineered floor. Buying our oak, unfinished is $5.50/Sq Ft installed and prefinished is $6.00/Sq Ft.
Wood reacts to humidity, so we test moisture first and leave proper expansion gaps. In very damp rooms we may suggest engineered planks.
Yes. We level low spots, fasten loose boards and fix squeaks before any new oak goes down.
We do, at roughly $1.00/Sq Ft, and the debris leaves in our truck. Nothing is left behind for you to deal with.
Yes, for a flat $250, and each piece returns where it started.
Reserving the estimate on our website cuts $250 from the project.
Prefinished rooms take a day or two. Raw oak sanded and finished in place runs closer to a week.
Employees from our own crew, with twelve months guaranteeing labor and the board maker covering the wood.