Boards Matched to Yours
Match Olive repair boards to the floor's dimensions and construction. Before ordering wood, check the milling and grain beside sound boards.
Match Olive repair boards to the floor's dimensions and construction. Before ordering wood, check the milling and grain beside sound boards.
Olive moisture repair starts with the source and affected assembly. Measure suitable conditions before replacement damaged floorboards.
Investigate Olive squeaks and gaps before selecting a remedy. Confirm whether the movement is seasonal or tied to fasteners and support.
Keep the one-year Olive repair workmanship terms alongside your patch boundary and details of the coating used on your boards.



For a property along Route 28A, mark the soft spot and check whether the support can be inspected from the crawlspace. Find the cause before removing the damaged boards.
Discuss damage at both sides of the doorway at your visit close the Ashokan Reservoir, then review sound boards near the casing. Bring photos of a soft area above a crawlspace vent to your visit near Shokan.
Before work near the Ashokan Rail Trail, review where it moves underfoot and plan for access to the fastening from below.
Consider the support on both sides along with the limit of the affected material at the Shokan walkthrough. Bring a clear photo of a covered porch at the end of a gravel drive.
For an address near Boiceville, check how deep the mark reaches. Include a board replacement if necessary.
Review correction of the moisture source near Olive before deciding how to handle readings that meet the assembly limits.
On site near West Shokan, compare changes across damp and dry periods and any movement in adjacent boards.
Bring photos for the Olive visit that help us examine the milling, thickness and species and a coated test piece next to retained wood.