Dustless Floor Refinishing
Sander dust goes through a hose into a sealed bag instead of onto your furniture. When sanding ends, we blow the walls and ceiling clean.
Sander dust goes through a hose into a sealed bag instead of onto your furniture. When sanding ends, we blow the walls and ceiling clean.
Under 1,500 Sq Ft figure 3 days clear or 4 stained, with an extra day in damp weather. Socks after a day, furniture after two.
A board cupped by a leaky window or dented by a dropped anchor is replaced from $150, then sanded flat with the rest.
Our labor is warranted for twelve months, by installers who are licensed, insured and certified by the NWFA. You pay 50% when sanding starts and 50% with the final coat.

A clear finish with no tint keeps oak pale and breezy in small island cottages.

A mid brown hides sand and dog hair in a family house that sees traffic all year.

A cool gray brown calms the orange tone of old red oak in a sunny room.

A golden shade with slight red warmth fits an old captain's house in town.

Deep walnut shows every grain line under a dining table in an older home.

Near black ebony looks sharp in a remodeled house, though dust and pet hair appear sooner.



The flat rate is $2.50/Sq Ft and covers sanding, a coat of stain and three coats of poly. Oak that is only dull may need just a $1.00/Sq Ft screen and recoat.
Yes. Once the old finish is sanded off, oak takes brown, walnut or a gray toned stain, and we test swatches on your own boards.
Under 1,500 Sq Ft, count 3 days clear or 4 with stain, plus a spare day in humid weather. Walk in socks the next day and move furniture back on day two.
Outside or behind a closed door. Paws can touch the finish after 24 hours, and trimmed nails help.
Not with our setup. Dust runs into sealed bags, and the crew vacuums and wipes everything before stain.
No. Leave a key with a neighbor or in a lockbox, since the crew needs daily access until the coats are dry.
Brazil Floors coordinates the ferry crossing for crew and material, and the crew stays on the job until the final coat.
Nothing is needed to hold a date. Half is due as sanding starts and half when the last coat is on.