Dustless Floor Refinishing
By Austin Street, review the work area.
By Austin Street, review the work area.
For a managed building lobby, choose a sample under daylight.
At a managed building lobby, mark the change in height.
By Queens Boulevard, review the written work scope.

At an inset entry threshold, compare natural oak under daylight.

By Station Square, try medium brown beside trim.

By Queens Boulevard, check neutral tones in daylight.

By an inset entry threshold, test a richer shade beside brick.

By Queens Boulevard, check walnut beside adjacent flooring.

Near Austin Street, compare espresso in brighter light.
With stain included near Station Square, allow $2.50/Sq Ft.
Set aside at Station Square three to four days.
Check usable wood depth near Austin Street.
Try stain at Station Square on prepared wood.
Inspect old patches near Austin Street for movement.
Plan access around Station Square before sanding.
View a sample by Station Square from two directions.
Mark the trim near Station Square you want retained.