Dustless Floor Refinishing
Our sanders run into a closed dust bag and not into your living room. A final blow down clears the trim and the ceiling edges.
Our sanders run into a closed dust bag and not into your living room. A final blow down clears the trim and the ceiling edges.
A home under 1,500 Sq Ft takes about 3 days clear or 4 with stain, plus a spare day when it is damp. Socks after 24 hours, furniture after 48.
Boards damaged by a leaking woodstove pad or a stove ash bucket are cut out and replaced from $150, then sanded into the surrounding floor.
The labor has a one year warranty, and the crew is licensed, insured and NWFA certified. Half is paid at the start and half at the finish.

A clear coat with no color keeps oak bright in a small cottage up in the hills.

A medium brown hides mud, dog hair and winter salt in a busy family home.

A cool gray brown softens orange oak in raised ranches on the slopes.

A warm gold with a hint of red suits the old Greek Revival homes in the village.

Deep walnut shows every grain line and looks rich in a farmhouse dining room.

Near black looks sleek in a modern remodel, though dust and pet hair stand out sooner.



The flat rate is $2.50/Sq Ft, covering sanding, stain and three poly coats. A floor that is only dull may qualify for a $1.00/Sq Ft screen and recoat.
Yes. After sanding, a cooler stain takes away the orange cast, and swatches go on your own floor first.
A home under 1,500 Sq Ft needs about 3 days clear or 4 with stain, plus a buffer. Socks are fine at 24 hours and furniture at 48.
Keep the dog out of the work area. Wood and ash storage can be moved for a flat $250 furniture moving fee if you want us to handle it.
Dust goes through a hose into sealed bags as we work. The crew then vacuums before any stain goes on.
No. Leave a key in a lockbox or with a neighbor, since the crew needs daily access until the final coat dries.
Refinishing runs $50 per step with stain. Treads are hand sanded to blend with the upstairs hall, and risers cost extra.
No deposit. Half is paid when sanding starts and the other half when the last coat is done.